Deal structures

Three ways to pay for the same fit-out

One operator, one fit-out, three structures. They differ in when the owner pays and when the revenue share starts — and that timing decides who carries the risk.

The structures

O1, O2 and O3

The same finished unit, funded three ways. What changes is the markup, the deferral markup, and who waits for the recoup.

O1

100% cash upfront

The owner pays the full cost plus markup in cash. The operator’s share of NOI starts from first operation.

Lowest risk to the operator, highest cash cost to the owner.

O2

Partial cash

The owner pays part of the cost plus markup in cash; the unpaid balance is recouped from operating income, with a higher deferral markup on the deferred part.

A middle path: some cash now, the rest from income.

O3

100% from operating income

The owner pays nothing upfront. The operator recoups the full fit-out from operating income; the share starts once recouped.

Most attractive to the owner, heaviest for the operator.

How cash moves in O1, O2 and O3 — who pays, when the share starts, per unit.

Per unit, EGP nominal, 10-year term.

Who wins

Operator vs owner

The operator’s NPV and the owner’s surplus pull in opposite directions. O1 is good for the operator; O3 is good for the owner; neither side can have both.

Operator NPV vs owner surplus for O1, O2 and O3, mid fit-out, all three markets (EGP M per unit).

Per unit, EGP nominal, 10-year term.

Read it as a trade, not a score

Negative operator NPV means the operator would need to be paid more than the NOI can return at the hurdle to break even. Positive owner surplus means the owner ends up richer than the next-best alternative (selling). Under O3 the owner is clearly better off and the operator is clearly worse off — that gap is the honest core of the whole model.

Base-case parameters

The numbers the model runs on

These are the s_op, markup and hurdle assumptions behind every result. Where a number is an unverified calibration it carries the badge.

Base-case parameters.
Parameter Value Status
Markup on cash (m)15%Assumed
Deferral markup (m′)25%Assumed
Cash share (p)50%Assumed
Operator share (s_op)30%Assumed
Recoup fraction (r)100% of NOI to recoup firstAssumed
Term10 yearsFixed
HurdleT-bill path + 8pt estUnverified calibration
VAT0% or 14%Scenario pair

The hurdle follows the T-bill path (recently around 25%) plus 8 points — an unverified calibration that moves the whole answer. See Assumptions & risks for the full calibration list.